Jun 08, 2021     Revising the fuel lines - (21 hours)       Category: Fuel System
6/8/2021

Finishing up the firewall forward metal fuel lines. The lines have heat shield wrap and I also wrapped the fuel filter bypass. I am still not very happy with the rubber supply line to the engine so I may redo to reposition the line with the jet "T"

5/9/2021

I have decided to redo the firewall forward fuel lines. I want to install metal lines as much as possible. I will leave the fuel hoses that attach to the engine for vibration purposes. The fuel pressure sensor should be located as close to the pressure source as possible so I fabricated a mount for the sensor above the gascolator.

More work to do but here is the initial work on the fuel lines


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.